What Are the Lead Times to Receive & Install Warehouse Pallet Rack?
How long does it take to receive and install warehouse pallet rack?
At Warehouse Optimizers, Inc. Many times you can receive the material in less than a week. On larger jobs, 4-6 weeks is the norm. The pace that we install pallet rack varies depending on many variables. First and for most, safety is our number one concern when any Warehouse Optimizers job
begins. All of our installers have been through OSHA 10 training or better and have a forklift license. PPE is used by Warehouse Optimizers crews on every job, whether required by the customer or not.
On small pallet rack jobs, we can install an average of 30-50 bays per day with a 3-4 man crew, depending on the number of levels and height. This includes:
- Unloading
- Anchoring
- Shimming for level beams from bay to bay
- Wire decking
On larger jobs with a 6-8 man crew, we can install about 6 truck loads of rack per week depending on the same criteria as above.
For more information, call us at (833) 336-7005 or email info@warehouseoptimizers.com.
Contact Us Today
We will be happy to assist you with any questions or more detailed product information on any Warehouse Optimizers products.